Home About Products Application Guide Installation Guide Design Software Project Photos Guarantee


Product Application Guide

The following guide is for general purposes only. Actual product selection and design should be developed using North American Green’s Erosion Control Materials Design Software (ECMDS®).

All unvegetated and vegetated Vmax3 performance values are based on laboratory research utilizing test methods similar to those detailed in ASTM D 6459-00.

Product Applications Limiting Shear Stress lb/ft2 (Pa)
Flow Duration
Permissible Velocity ft/s
(m/s)
Typical Projects FHWA FP-03
TRM Categories
Bare Soil Vegetated
0.5 hr 50 hr 0.5 hr 50 hr Unvegetated Vegetated
SC250® 1:1 & Greater Slopes

Medium to High Flow Channels

24-Month Vegetation Grow-in Period
3.0
(144)
2.5
(120)
10.0
(480)
8.0
(373)
9.5
(2.9)
15
(4.6)
Roadside Ditches, Golf Course Swales, Stream Bank Protection Types 5.A, B and C
C350® 1:1 & Greater Slopes

High Flow Channels

36-Month Vegetation Grow-in Period
3.2
(153)
3.0
(144)
12.0
(576)
10.0
(480)
10.5
(3.2)
20
(6.0)
Drainage Ditches, High Flow Areas, Shoreline Protection Types 5.A, B and C
P550® 1:1 & Greater Slopes

Extreme High Flow Channels

36-Month Vegetation Grow-in Period or When Sparse Vegetation Stand Is Expected
4.0
(191)
3.25
(156)
14.0
(672)
12.0
(576)
12.5
(3.8)
25
(7.6)
Spillways, Swales, High Flow Drainage Areas, Shoreline Protection Types 5.A, B and C


All Vmax3 products have been tested by AASHTO's National Transportation Product Evaluation Program for RECPs.
GSA Contract Number GS-07F-8870D : 04/01/2004-03/31/2009